Issue - meetings

Planning Application: Waste

Meeting: 09/07/2019 - Planning Committee (Item 6)

6 Planning Application: Waste pdf icon PDF 192 KB

Report by Head of Planning Services.

 

To consider and determine the following application:

 

WSCC/050/18/BK        Erection of replacement dwelling, including acoustic bunds along east, west and side boundaries.  Dan Tree Farm, London Road, Bolney, West Sussex, RH17 5QD.

 

Additional documents:

Minutes:

WSCC/050/18/BK       Erection of replacement dwelling, including acoustic bunds along east, west and side boundaries.  Dan Tree Farm, London Road, Bolney, West Sussex, RH17 5QD.

 

6.1    The Committee considered a report by the Head of Planning Services (copy appended to the signed copy of the minutes).  The report was introduced by James Neave, Principal Planner, who gave a presentation on the proposals, details of the consultation and key issues in respect of the application.

 

6.2    Mr Alan Potter, specialist on waste planning policy on behalf of the applicant, spoke in support of the application.  Mr Potter declared that he recently worked with the County Council on annual reports on construction waste management capacity and the formulation of the current WLP.  The application is compliant with at least five out of nine criteria of Policy W8 of the WLP: it provides clear benefits; involves only material that cannot be recycled or treated and is suitable for the purpose; does not involve unacceptable impacts on natural resources or other environmental constraints, and does not sterilise mineral reserves.  The criterion requiring a genuine need to use waste material is about proposals not being advanced solely on the basis of providing outlets for waste; it should not be construed as a ‘need’.  The bund is not a waste development, it is only being heard as such because of the County Council’s insistence that it is.  The bund may be constructed of material that is not defined as waste.  Regarding criteria for amount of material, the design will minimise the amount used whilst achieving performance in noise mitigation.  The applicant was given no opportunity to demonstrate an identified need for disposal of inert waste.  The County Council itself predicts an exhaustion of recovery capacity in 2019-20, so the assertion that material could be otherwise managed through recovery is not supported by facts.  The application will help meet local needs.

 

6.3    Mr Peter Radmall, author of the Landscape and Visual Impact Assessment (LVIA), spoke in support of the application.  Design of the bunds must strike a balance between acoustic mitigation, the natural terrain, ease of construction and proportion of the residential land used.  Local topography is already extensively modified, mainly due to the A23 and there is acoustic bunding immediately to the south so engineered landforms are already characteristic in the area and the bund would not be incongruous.  Earthworks on the A23 have become densely vegetated and are readily assimilated into the landscape; vegetation on the proposed bund will soften the effect.  The current site contributes little to the character of the area.  The development will not affect the vegetated boundaries which already screen the site.  Development will be most visible during construction.  A planting scheme will be agreed.  Regarding the AONB Management Plan, the site has no bearing on settlements or routeways, supports neither woodland nor heathland and is not part of any historic field pattern, so does not impact on the character of the High Weald.  In terms of natural topography, the  ...  view the full minutes text for item 6